Jul
24

Is the weekend over already?

By Critter

I definitely should have started this weekend with a list of priorities, as I was all over themap. The good news (for me at least) is that I did get quite a few things done.

I have been wanting a new setup for my snakes lately, and have been researching quite a fewdesigns. One of the materials I have been wanting to use in the cages is called shower surround or tileboard. A very unique name, right? Youwould think it would be easy to find. That is definitely not the case. It took several trips to Lowe’s to actually find what I was looking for. I don’t know how many employees I had asked, but they all kept referring me to the pre-moldedshower pieces. I finally found it when I walked the entire store, aisle by aisle. It was located overy by the pegboard, but was coveredup. Anyway, it is a cheap ($11 something a 4×8 sheet), waterproof, and light material. Perfect for reptile cages. The first cage (I’ll get pictureslater) for Corona, turned out great. The two bottom cages in the series are/will be 2 ft. high. The other two cages that will stack on top will only be 18 in.

As the kitchen floor goes, well now that is another story. Shall I? It is coming along, slowly,but it is definitely getting there. I am currently more than halfway done. The next big bit will involve removing the sink and all the cabinetsalong the wall. I would like to get that bit all tackled in one day. Then it’s on to finish the drywall. I would have been able to avoid this, but the stupid backsplash that is heavily mortored on will damage the drywall when I remove it.

I am pushing this up to the server from a test application, so I will cut the post short for now. I’ll post more in the morning…

VN:F [1.8.2_1042]
Rating: 0.0/5 (0 votes cast)
VN:F [1.8.2_1042]
Rating: 0 (from 0 votes)
Share and Enjoy:
  • Digg
  • del.icio.us
  • Facebook
  • NewsVine
  • Posterous
  • StumbleUpon
  • Tumblr
  • Twitter
Categories : General
blog comments powered by Disqus